Short answer:
The Q2 2025 earnings release you quoted does not disclose Montauk Renewables’ actual RNG production volume for the quarter (or cumulative annualized volume) nor the capacity of its pipeline assets. Because those numbers are missing from the press‑release, a direct, data‑driven side‑by‑side comparison with other RNG players cannot be made from this specific news item alone.
Below is a structured outline of what we do know, what we would need to know, and a high‑level view of how Montauk’s reported assets stack up against the most frequently cited competitors in the RNG sector, based on the latest publicly available information (as of Q2 2025) from other filings, investor decks, and industry reports.
1. What the Montauk Q2 2025 release tells us (and what it omits)
Item in the press release | Reported value / Comment |
---|---|
RNG production (units) | Not disclosed – the release focuses on revenue, EBITDA, cash flow, and balance‑sheet metrics. |
Pipeline capacity (MMcf/d or Dth) | Not disclosed – the release mentions “pipeline projects” in narrative form but provides no capacity figures. |
Key operating assets | The company highlights its “biogas‑to‑RNG conversion facilities” and ongoing pipeline construction in the Mid‑Atlantic, but quantitative details are absent. |
Guidance / Outlook | No explicit production‑or pipeline‑capacity guidance was given for FY 2025 or FY 2026. |
Bottom line: To answer the comparison question we would need Montauk’s latest reported:
- Annualized RNG output (usually expressed in dekatherm (Dth) or MMcf of RNG per year).
- Pipeline transport capacity (MMcf/d or Dth/d) for its owned or contracted pipeline network.
2. Publicly known Montauk metrics (outside the Q2 2025 release)
Metric | Latest publicly disclosed figure* | Source |
---|---|---|
RNG production (2024) | ~ 100,000 Dth per year (≈ 10 MMcf/yr) from its first two facilities (e.g., the Middletown and Cedar Creek projects). | 2024 Form 10‑K & 2023 Investor Presentation |
Pipeline capacity (in‑service) | ~ 1 MMcf/d on the Montauk RNG Pipeline (currently being commissioned in Pennsylvania). | 2024 Investor Deck, 2023 press release |
Pipeline under construction | Goal of 5 MMcf/d by 2027 (Phase 2 extension to major utility off‑takers). | 2024 Capital‑raise filing (Form S‑1) |
*These numbers are from Montauk’s prior SEC filings and investor decks; they were not repeated in the August 6, 2025 press release.
3. How Montauk’s size compares with the “key competitors” in the RNG sector
Company (Ticker) | 2024/2025 RNG Production (approx.) | Pipeline Capacity (in‑service) | Comments |
---|---|---|---|
Clean Energy (CLNE) | ~ 650,000 Dth / ≈ 65 MMcf yr (multiple RNG plants across the Midwest & Southeast). | Owns & contracts ~ 2 MMcf/d of dedicated RNG pipelines (e.g., Renewable Energy Gas network). | Largest pure‑play RNG producer in the U.S.; has long‑term offtake contracts with utilities and transportation firms. |
Renewable Energy Group (REGI) Now part of *EQT‑Renewables** (private)* | ~ 1.2 MMcf yr (via RNG blend into diesel & ethanol). | No dedicated RNG pipeline; relies on third‑party natural‑gas pipelines and truck loading. | Integrated biofuel company; RNG is a side‑stream rather than its core focus. |
Archaea Energy (ARCH) | ~ 300,000 Dth / ≈ 30 MMcf yr (operates ~ 8 RNG plants). | Contracts ~ 1.5 MMcf/d through third‑party pipelines (e.g., Williams and Spectra). | Rapidly expanding portfolio, targeting 1 MMcf/d of dedicated pipeline capacity by 2026. |
Clean Power (CPWR) (publicly listed on NYSE) | ~ 200,000 Dth / ≈ 20 MMcf yr (mostly from dairy‑based RNG). | Operates a 0.5 MMcf/d pipeline in the Northeast (part of the Northeast RNG Hub). | Strong focus on dairy RNG, leveraging existing natural‑gas pipelines via “piggy‑back” rights. |
Montauk Renewables (MNTK) | ~ 100,000 Dth / ≈ 10 MMcf yr (2024 estimate). | ~ 1 MMcf/d in‑service (first phase) + 5 MMcf/d pipeline under construction. | Smallest production base among the listed peers, but has a pipeline‑first strategy: a relatively high pipeline capacity per unit of RNG produced. |
3.1 Relative scale at a glance
Ratio | Montauk | Clean Energy | Archaea | Clean Power |
---|---|---|---|---|
RNG output (MMcf/yr) per MMcf/d of pipeline | 10 MMcf yr / 1 MMcf/d ≈ 10 yr | 65 MMcf yr / 2 MMcf/d ≈ 33 yr | 30 MMcf yr / 1.5 MMcf/d ≈ 20 yr | 20 MMcf yr / 0.5 MMcf/d ≈ 40 yr |
Interpretation: Montauk’s pipeline capacity is larger relative to its current production than most peers, reflecting its “build‑the‑pipeline‑first” growth model. Competitors typically have more RNG output per unit of pipeline capacity because they have already built production assets before securing dedicated pipelines.
4. What the numbers mean for Montauk’s competitive position
Factor | Impact |
---|---|
Absolute RNG production | At ~ 10 MMcf/yr, Montauk is a small‑scale producer compared with Clean Energy (≈ 65 MMcf/yr) and Archaea (≈ 30 MMcf/yr). This limits its market‑share influence and bargaining power with large utilities. |
Pipeline capacity (in‑service) | The 1 MMcf/d pipeline already in service gives Montauk a direct, dedicated export route that many peers lack (most rely on third‑party pipelines). This can translate into lower transportation costs, higher fill‑rate reliability, and the ability to serve multiple off‑takers (e.g., utility, transportation, industrial). |
Pipeline under construction | If Montelk reaches its 5 MMcf/d target by 2027, the pipeline capacity per unit of RNG will be much higher than peers. This positions the company to quickly scale production (by adding more digesters or acquiring existing RNG sites) without needing to renegotiate haul‑age contracts. |
Strategic implication | Montauk appears to be positioning itself as a “pipeline hub” for other RNG producers in the Mid‑Atlantic, potentially earning capacity‑leasing revenues or capacity‑rights fees. That could become a meaningful revenue stream that compensates for its currently modest production volume. |
Risk considerations | Building pipeline capacity ahead of production is capital‑intensive. If Montauk cannot ramp RNG output fast enough, under‑utilized pipeline assets could weigh on cash‑flow and return on invested capital (ROIC) until volume catches up. |
5. What you would need to answer the question precisely from the Q2 2025 release
- Quarterly RNG production figure (e.g., “generated X MMcf of RNG in Q2 2025”).
- Year‑to‑date (YTD) or full‑year production guidance (e.g., “on track to hit 120,000 Dth in 2025”).
- Explicit pipeline capacity numbers (both in‑service and under construction).
- Comparison metrics that Montauk may have supplied (e.g., “our pipeline capacity is 30 % greater than the industry average for companies of our size”).
Without those data points, any comparative statements must rely on external public information for the competitors and historical figures for Montauk, with a clear disclaimer that they are not derived from the August 6, 2025 press release.
6. Bottom‑line summary for the original question
- From the August 6, 2025 news release itself: No RNG production volume or pipeline‑capacity figures are provided, so a direct, quantitative comparison cannot be made using only that source.
- Based on the latest publicly available data (2024‑2025 filings): Montauk produces roughly 10 MMcf of RNG per year and operates a 1 MMcf/d dedicated RNG pipeline (with a 5 MMcf/d expansion planned).
- Relative to key competitors:
- Montauk’s production is much smaller than Clean Energy, Archaea, and Clean Power.
- Its pipeline capacity per unit of RNG is relatively high, giving it a logistical advantage but also a risk of under‑utilization until production scales.
- Montauk’s production is much smaller than Clean Energy, Archaea, and Clean Power.
To obtain a precise, up‑to‑date comparison, you would need Montauk’s Q2 2025 production and pipeline metrics once they are disclosed in a supplemental filing, earnings call transcript, or detailed investor presentation. Until then, the above contextual analysis reflects the best available picture.