When can we expect a full resource estimate or updated NI 43-101 report based on this drill campaign?
Timing of the next NI 43‑101 update
Fury’s press‑release (12 Aug 2025) makes clear that the six‑hole “inaugural” campaign at Sakami is only the first phase of a larger drilling program. The company’s filing history and industry practice suggest that a full NI 43‑101 resource estimate will not be released immediately after the first six holes; the company will need to complete the planned drill program (typically 12–15 holes for a maiden resource), finish data‑validation, and run the requisite metallurgical and economic modeling. Based on the timing of comparable projects, an updated NI 43‑101 is most realistically expected within 9‑12 months of the August 2025 release—i.e., in Q4 2025 to Q1 2026. The company will likely file a Technical Report (including a preliminary resource) either as a stand‑alone NI 43‑101 supplement or as part of a larger Q3‑Q4 2025 update, depending on how quickly the remaining holes are completed and the data are verified.
Trading implications
The market has already priced in the positive initial intercepts, reflected in a modest bullish sentiment (+70). If Fury can maintain or improve the grades and continuity in the upcoming holes, the upcoming NI 43‑101 filing could act as a catalyst, pushing the stock higher as a more concrete resource estimate becomes available. Traders should watch for a “resource‑update” catalyst in the Q4 2025–Q1 2026 window; a positive NI 43‑101 (e.g., a maiden resource with >5 Mt at ≥1.5 g/t Au) would likely trigger a short‑term breakout, while a delayed or low‑grade estimate could trigger a pull‑back. In the meantime, a cautious “buy‑on‑dip” strategy is warranted: consider adding to positions on pull‑backs (e.g., 5‑10% below the recent 20‑day average) while keeping a tight stop (≈4% below entry) to manage the risk of a delayed resource update. Monitor the company’s upcoming press releases and any filings with SEDAR for a concrete timeline.