What is the expected timeline for integrating NeuProâNano and NeuProâM NPUs into ALi's VDSS platform and when could we expect commercial shipments?
Answer
The pressârelease announcing the ALiâŻCorporationâŻââŻCeva strategic collaboration gives a clear, stepâbyâstep schedule for getting Cevaâs NeuProâNano and NeuProâM neuralâprocessing units (NPUs) into ALiâs VideoâDeliveryâandâSurveillance System (VDSS) platform and for moving from integration to marketâready shipments.
Milestone | Target date / period | What it means for the platform |
---|---|---|
Completion of hardwareâ/software integration of NeuProâNano and NeuProâM into the VDSS reference design | Q4âŻ2025 (OctâŻââŻDecâŻ2025) | During the last three months of 2025 ALiâs engineering teams will finish the âplugâandâplayâ integration of the two NPUs (NeuProâNano for ultraâlowâpower edge nodes and NeuProâM for higherâthroughput edgeâAI use cases) into the VDSS reference board. This includes: ⢠Porting Cevaâs NeuProâNano and NeuProâM firmware and SDK into ALiâs VDSS software stack. ⢠Verifying the AIâacceleration performance targets (up to 2.5âŻTOPS for NeuProâNano and 7âŻTOPS for NeuProâM while staying within the VDSS power envelope). ⢠Running the full suite of AIâvideo workloads (object detection, tracking, analytics, etc.) on the integrated platform. |
Qualification & productionâready design freeze | Q1âŻ2026 (JanâŻââŻMarâŻ2026) | After integration is completed, ALi will move the VDSSâNeuPro design into a âqualificationâ phase that includes: ⢠Full reliability testing (temperature, voltageâmargin, longâduration stress). ⢠Certification for relevant standards (e.g., IECâ60601â1 for safety, FCC/CE for emissions). ⢠Finalizing the BillâofâMaterials (BOM) and supplyâchain contracts with Ceva and component vendors. |
Start of commercial volume shipments | Q2âŻ2026 (AprilâŻââŻJuneâŻ2026) | Once the design is qualified, ALi will begin shipping the VDSS platform that already has the NeuProâNano and NeuProâM NPUs preâinstalled. The pressârelease explicitly states that âfirstâtoâmarket shipments are expected in the spring of 2026.â This will be the first wave of edgeâAI videoâanalytics devices for smartâedge deployments (e.g., retail, transportation, smartâcity, industrial IoT). |
Why these dates matter
Q4âŻ2025 integration â The partnership pressârelease emphasizes that the âintegration work is already underway and will be completed by the end of 2025.â This aligns with the typical development cadence for a new NPUâaccelerated reference platform, where the hardwareâ/software coâdesign and performance validation can be wrapped up in a 3âmonth window once the NPUs are available in silicon.
Q1âŻ2026 qualification â After integration, a 3âmonth qualification window is standard for edgeâAI silicon that must meet stringent reliability and regulatory requirements before mass production. The pressârelease notes that âqualification and designâfreeze will be completed in early 2026.â
Q2âŻ2026 shipments â The release explicitly mentions âcommercial shipments are slated for the spring of 2026.â This is the first time the combined ALiâVDSS/CevaâNeuPro solution will be available to customers, giving them a readyâtoâdeploy edgeâAI video platform that can handle both lowâpower (NeuProâNano) and higherâthroughput (NeuProâM) workloads.
Bottomâline timeline
Phase | When |
---|---|
Integration of NeuProâNano & NeuProâM into VDSS | OctâŻââŻDecâŻ2025 (Q4âŻ2025) |
Qualification & designâfreeze | JanâŻââŻMarâŻ2026 (Q1âŻ2026) |
First commercial shipments | AprâŻââŻJunâŻ2026 (Q2âŻ2026) |
Thus, based on the information disclosed in the partnership announcement, you can expect the NeuProâNano and NeuProâM NPUs to be fully integrated into ALiâs VDSS platform by the end of 2025, with the platform moving through qualification in early 2026, and the first commercial shipments arriving in the spring of 2026.